The construction phase is a black box — until something goes wrong.

Remoistening, stalled drying, improper drying heating, leaks: nobody sees what happens inside the component — until the damage is visible. And in a dispute it's word against word, because nothing was measured and nothing documented. Intect makes the construction phase controllable: continuous data from inside the component instead of flying blind.

What your digital building physicist delivers

Early warning instead of late consequences

Detects remoistening and drying that isn't going to plan early — before it becomes damage.

Active recommendations

When to ventilate and when not to, when a CM test makes sense — plus a covering-readiness forecast.

Control of drying heating

Monitors the heating phase and warns of improper execution.

Seamless evidence trail

Time-stamped documentation across the entire warranty phase — errors traceable, a solid record in case of dispute.

Leak localisation after installation

Locates leaks based on the moisture curve inside the component.

The site reports to you

No new app needed: warnings and recommendations arrive directly via WhatsApp. The AI agent answers questions about the drying progress instantly — in your language.

How it works

1

Place the sensor

The AntOne sensor is positioned in the screed during installation — fully embedded, nothing protrudes.

2

Data flows

Moisture and temperature transmit continuously through the material to the gateway and into the Intect Cloud.

3

Warning, recommendation & proof

Warnings and recommendations arrive via WhatsApp; every curve is documented with timestamps — from day one to the end of the warranty.

Control of the construction phase shows most clearly where deadlines and money are at stake — covering readiness.

One application: screed drying

Covering too early is the most expensive construction defect.

The drying curve in g/m³ — comparable with the CM reference — shows at any time where the screed stands. Ventilation and drying heating are controlled on measured values; the CM test is scheduled when the curve justifies it.

More on screed drying →
Intect Portal — Trocknungsverlauf

What is measured

Material temperature & moisture
Directly inside the component, continuously.
Room climate
Temperature and humidity as reference.
Nearest weather station
Outdoor climate feeds into the evaluation.
Drying forecast
Expected curve up to covering readiness.
Alerts
On stagnation, condensation risk or renewed rise.

Who it's for

Screed layers

Evidence for your own work: the documented curve proves proper installation and drying — even years later.

Site managers / GC

Control over deadlines and liability: detect disruptions early, base decisions on measured data, delineate responsibilities cleanly.

Architects & clients

Documented certainty in the project records: the seamless moisture history as part of acceptance and warranty documents.

Test it in your own project.

Request a pilot project — reply within 2 working days.

Start a pilot

Stay up to date

Product updates, pilot reports and screed drying know-how. No spam, unsubscribe anytime.